A large hydropower station has a head of 324 metre and an average flow of 1370 metre3 / second. The available hydraulic power from this station will be: A) 4.35 MW B) 4.15 MW C) 4.47 MW D) 4.73 MW

in Electric Power Generation by

1 Answer

0 like 0 dislike

 A large hydropower station has a head of 324 metre and an average flow of 1370 metre3 / second. The available hydraulic power from this station will be: 4.35 MW