A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be: A) 2.19 x 106 MWhr B) 600 MWhr C) 250 MWhr D) 7.50 x 106 MWhr

Your answer

Thanks for your contribution. Feel free to answer this question. Please avoid short answer. Your answer is most welcome. Be genuine.

Upload image or document:

Your name to display (optional):
Privacy: Your email address will only be used for sending these notifications.
Anti-spam verification:
Are you a robot ? (Y = Yes / N = No)
To avoid this verification in future, please log in or register.

1 Answer

0 votes
answered by

A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be: 2.19 x 106 MWhr 

Welcome to Q&A site for electrical and electronics engineering discussion for diploma, B.E./B.Tech, M.E./M.Tech, & PhD study.
If you have a new question please ask in English.
If you want to help this community answer these questions.

...