Welcome to electrical and electronics engineering discussion website, Please login or register to continue.

Welcome to electrical and electronics engineering Q&A site...

Join our WhatsApp group

Please log in or register to answer this question.

1 Answer

0 votes
by

image

A) Start up meeting: For this programme, we proceed with this meeting. If then continue us until implementation of energy saving measures. B) Analysis of energy used: Identify where energy used & it shows on which area should be concentrate. C) Collecting basic data: At site load, some of the following important points: 1.Operating hours 2.Duty cycle 3.Actual power consume D) Observation of actual field: After collecting data, we start actual field work. It means we have find out process where energy saving can be done. Always apply the 80 by 20 rule. It means concentrate on opportunities that require 20% input & givens 80% of the saving. E) Cost benefit analysis of the data: The energy conservation opportunities analysis should be in terms of cost of carrying out that project v/s the benefit that can be earned. F) Reporting: We have to submit the detail report. Then we have to take sanction of that report from final Authority. G) Action plan: In this all the measure steps must be included in the action plan for the proper implementation.

OR

1. Collect information about the plan: In this information, the measured energy used, raw material required & components required for the plant are considered. 2. Collect production process: In this process, the design the flowchart of production process, the schedule of operation & its time frame is also considered. 3. Energy and utility system: In this step, load variation in pumps, fans & compressors are considered, the analysis of energy loss and measurement of insulation level is also considered. 1. Collect information about the plan: In this information, the measured energy used, raw material required & components required for the plant are considered. 2. Collect production process: In this process, the design the flowchart of production process, the schedule of operation & its time frame is also considered. 3. Energy and utility system: In this step, load variation in pumps, fans & compressors are considered, the analysis of energy loss and measurement of insulation level is also considered.

Amazon Shopping

Welcome to Q&A site for electrical and electronics engineering discussion for diploma, B.E./B.Tech, M.E./M.Tech, & PhD study.
If you have a new question please ask in English.
If you want to help this community answer these questions.

Categories

Most popular tags

power motor dc circuit transformer voltage current used system phase factor resistance load synchronous energy ac induction generator electric series frequency use speed capacitor between meter electrical line type mosfet control transmission difference magnetic plant high single instrument bjt source advantages function diode machine unit winding torque amplifier define supply thyristor motors arduino field shunt relay armature problem electricity maximum time parallel on transformers types coil diagram state flow value material three starting and direction method emf operating theorem digital microprocessor test instruments efficiency ratio loss measure operation connected low applications wave effect single-phase working losses different network wattmeter temperature measuring constant signal controlled breaker device full compare drive wire resistivity logic materials machines inductance switch flux disadvantages converter transistor gain protection scr angle force core measurement number free principle rc generators law negative bridge friction open pole conductor conservation steam iron loop resistors hysteresis short computer using lines secondary station battery rectifier inverter linear relays nuclear regulation circuits design analog work rotor electronics gate forces diesel damping rlc connection factors capacitors minimum insulation basic moving running reactance systems air fault range direct main stability quality starter igbt eddy ideal ammeter rl 3-phase plants arc induced thermal error fuzzy biasing dielectric pressure balanced superposition errors rotation characteristics feedback measured electronic start alternator off back curve over solar three-phase tariff locomotive peak bias zener capacitance commutator surge rating universal potentiometer permanent mechanical copper self transducer capacity electrons memory adc excitation inductive explain fuse pure harmonics application internal pmmc average reaction welding resonance traction breakers designed electromagnetic si generation brushes density switching shaded rate impedance distribution transfer methods star oscillator reluctance semiconductor inductor simplification algebra 8085 boolean weston dynamometer insulating strength installation permeability definition fuel heating earth units neutral rms rated engineering conductors coefficient controller usually reverse excited analysis change body components
...