5 views
asked by
Back-to back connection is used in HVDC system to 

A) Provide synchronous tie between two systems B) Provide bulk power transmission over long distance C) Provide asynchronous tie between two systems D) Reduce the line voltage drop and the transmission loss

Please log in or register to answer this question.

Welcome to Q&A site for electrical and electronics engineering discussion for diploma, B.E./B.Tech, M.E./M.Tech, & PhD study.
If you have a new question please ask in English.
If you want to help this community answer these questions.

...